Friday, October 15, 2010

day 4: a mess

our project is not a mess
it is moving along just fine;
however, it is really messy

the floor looks like this

(and this is a rather clean section)

the ceiling looks like this


craig and i got to fight with the walls 
to run wire to what will be our new switches.
if you have never done this you will not be able 
to understand exactly what a horrible process this is.
i won't even try to explain.

by the end of the night craig could not stop sneezing
and coughing from all the dust he had inhaled. 
he went and took a shower
while i cleaned up piles of drywall dust. 

here is what it looked like when we went to bed


and the driveway looked like this



the bagster better be gone tomorrow!
(i have faith in them.)

oh and to leave on an exciting note
electricity:one, craig:zero
we had a shock but
everyone ended up alright